THE LATEST UPDATE FOR PRE-CONSTRUCTION PROJECTS
in GREATER TORONTO AND SOUTHERN ONTARIO
East Junction Condos is a new condo and townhouse development by Limen currently in preconstruction at 394 Symington Avenue, Toronto. The development is scheduled for completion in 2021. East Junction Condos has a total of 278 units. Sizes range from 370 to 890 square feet.
Feels like home. Just a cooler version. With a confident, stream-lined aesthetic, tiered elements and contemporary brick, street level towns, EJ makes a modern statement that fits seamlessly into its urban landscape. Everything has been designed around maximizing natural light, while offering views of downtown, the surrounding neighbourhood and nearby High Park.
With a fantastic Walk Score of 90/100, East Junction Condos is a walker’s paradise as daily errands do not require a car. 24-hour bus routes along both Davenport Rd. and Dupont St. and a short ride to the Dundas West Transit hub connects residents to the GO, the subway and the Union Pearson Express. For motorists, the Gardiner Expy is easily accessible from East Junction Condos as the on/off ramp is located nearby.
Project Name: | East Junction |
Builders: | Limen |
Project Status: | Pre-Construction |
Approx Occupancy Date: | Fall 2021 |
Address: | 394 Symington Ave Toronto, ON M6N 2W3 |
Number Of Buildings: | 1 |
City: | Toronto |
Main Intersection: | Eglinton Ave West & Dufferin St |
Area: | St Clair Ave West |
Municipality: | W03 |
Neighborhood: | Weston-Pellam Park |
Architect: | Kirkor Architect + Planners |
Development Type: | Mid Rise Condo |
Development Style: | Condo |
Building Size: | 16 |
Number Of Units: | 278 |
Nearby Parks: | Wadsworth Park, Sadra Park Trail, Earlscourt Park |